Devin W.C. Ryan

Wing

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons

Saturday was another great building session.  John stopped by for a visit to check out how things were coming along and contrary to the ‘hack’ job he voices I believe he thinks I’m doing a pretty decent job :). Thanks to Peter for trimming off the excess of the top left covering I didn’t have …

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons Read More »