Devin W.C. Ryan

Month: May 2020

Stabilizer Leading Edge Rounded

Building Aero 3D Day 59: Hinging Control Surfaces

Thursday, utilized the slot machine (motorized hinge slotting machine by Great Planes) to make hinges in the following control surfaces: Ailerons Elevators Stabilizer I definitely need more practice with this as I always have a tendancy to tilt the machine towards me causing me to come out the side. That said though, made some solid …

Building Aero 3D Day 59: Hinging Control Surfaces Read More »

W-SH-6 & W-ST-2s Stagged In Position

Building Aero 3D Day 55: WC Assembly Pieces

Sunday, I continued work on the WC assembly building upon Saturdays success. I started by building the other W-ST-2 (top in image below), which invovled going through the same process as in the previous post and then moved on to the 3/32” balsa sheeting piece W-SH-6.