Devin W.C. Ryan

Month: January 2017

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons

Saturday was another great building session.  John stopped by for a visit to check out how things were coming along and contrary to the ‘hack’ job he voices I believe he thinks I’m doing a pretty decent job :). Thanks to Peter for trimming off the excess of the top left covering I didn’t have …

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons Read More »

Top Right Wing Panel

Building 4 Star 60 Day 29: Wing Servo Hatches Exposed + Top Covering

Tuesday I was able to work on my plane for a couple hours. Prior to covering the top of the wing I needed to cut the covering that was over the servo hatches.  After cutting the covering into an ‘X’, corner to corner, I turned the wing back around and ensured that the covering is …

Building 4 Star 60 Day 29: Wing Servo Hatches Exposed + Top Covering Read More »