Devin W.C. Ryan

R/C Airplanes

Tracking my R/C Plane Builds and Key Moments

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons

Saturday was another great building session.  John stopped by for a visit to check out how things were coming along and contrary to the ‘hack’ job he voices I believe he thinks I’m doing a pretty decent job :). Thanks to Peter for trimming off the excess of the top left covering I didn’t have

Building 4 Star 60 Day 30: Left/Center Top Wing Covered + Ailerons Read More »

Top trailing edge covered

Building 4 Star 60 Day 27: Visitors & Covering

Tuesday was all about covering and a special visitor.  Stephanie stopped by to check out what I’ve been up to.  Even though she has been seeing the pictures/posts along the way I believe she gained a better appreciation of what’s involved and how the plane looks (especially the size of the aircraft).  Stephanie also helped

Building 4 Star 60 Day 27: Visitors & Covering Read More »