Devin W.C. Ryan

Wing

Top Right Wing Panel Covered

Building Seamaster Day 35 & 36: Bottom Completed, Started Cover Wing Top

On Nov. 6th I finished covering the bottom of the wing by cutting two pieces to fit down the center, seen below.  The first wraps around the leading edge of the wing and goes down to the edge protrusion and the other goes from bottom of the protrusion to the trailing edge where it was …

Building Seamaster Day 35 & 36: Bottom Completed, Started Cover Wing Top Read More »

Rounded Stab Leading Edge

Building Seamaster Day 30: Sanding & Covering Tail/Stab

Yesterday started with seeing what Peter had down, which was installed the hinges for the ailerons onto the trailing edge of the wing.  This involved making a two toothpick sized wholes per hinge as well as drilling a hole for the toothpick into the hinge itself.  Then the hinges were glued inside the slot with …

Building Seamaster Day 30: Sanding & Covering Tail/Stab Read More »