Devin W.C. Ryan

Building 4 Star 60

Power Switch Installed

Building 4 Star 60 Day 43: Fuselage Covered, Engine & Battery Installed

Seeing everything coming together and how far I have come since day 1 when this project began has been really rewarding.  I believe I have learned a lot throughout the process and still have so much to learn!  It has been a lot of fun seeing the aircraft take shape. I started the day by continuing where …

Building 4 Star 60 Day 43: Fuselage Covered, Engine & Battery Installed Read More »

Canopy Installed

Building 4 Star 60 Day 45: Canopy Installed, Servo Test & Landing Gear

After yesterdays session you can really get a sense of what my aircraft will look like (without the wing anyways).  I started my day with covering the hatch cover.  I wanted to break up all the white on the fuselage and since Peter and I had the same idea for what color should be used …

Building 4 Star 60 Day 45: Canopy Installed, Servo Test & Landing Gear Read More »

Building 4 Star 60 Day 46: Throttle control adjustments

Tuesday was a productive session though it appears not much was done as it was about getting the throttle working properly (with the transmitter) through a lot of adjusting and installing the extension for adjusting one of the speed settings, see below: In order to accomplish these two tasks a bigger hole had to be …

Building 4 Star 60 Day 46: Throttle control adjustments Read More »