Building 4 Star 60 Day 8: Fuse Top and Bottom Front
Today’s building session was all about the bottom and a little time to sand the fibreglass wrap over the metal wire and wood for the one side where the elevator connected. Once fibreglass was sanded down I turned my attention to the fuselage. We started work on the table by looking at the landing gear plate, […]
Building 4 Star 60 Day 8: Fuse Top and Bottom Front Read More »