Devin W.C. Ryan

Bottom triangle stock sanded and formed at bottom of fin for aerodynamics

Building Seamaster Day 23: Tail Fin

On May 12th I worked on the tail of the aircraft.  The first task was to sand and form/tapper the bottom triangle stock supporting the bottom of the tail fin and for aerodynamics, seen above.

The next task for the day was getting the triangle stock in place flush with the top of the fin to support the stab at a later date.  You can see a back and top view of this below:

Stabilizer triangle blocks glued
Stabilizer triangle blocks glued (back view)
Stabilizer triangle blocks glued (top view)
Stabilizer triangle blocks glued (top view)

Leave a Comment

Your email address will not be published. Required fields are marked *