Devin W.C. Ryan

4 Star 60

Prepped for Dowels

Building 4 Star 60 Day 21: Dowel Holes, T1 Reinforced, Switch & Stabilizer

Yesterday we had a productive 2 hr building session.  I love seeing my project slowly come together and take on more and more of a ‘total plane’ look/shape. The evening started with checking out the ‘rig’ Peter created for drilling the holes for the dowels into the dowel support blocks.  Because every planes wing is …

Building 4 Star 60 Day 21: Dowel Holes, T1 Reinforced, Switch & Stabilizer Read More »

Building 4 Star 60 Day 15: Wings Coming Along

Wednesday evening was an exciting building session as I can really see how things are going to be fitting together!  We looked how the stabilizer and fin will connect to the fuselage, which really makes the project take shape! Worked on both wings.  Started with the right wing, above, by cutting and sanding the dihedral angle on …

Building 4 Star 60 Day 15: Wings Coming Along Read More »