Devin W.C. Ryan

Elevator Framework

Building Aero 3D Day 12: Elevator Framework Pinned

Yesterday I did some work on the elevators by myself. This involved getting the perimeter of the right elevator pinned in place and then measuring the length for the ‘cross-braces’ making up the internal structure of the elevators and getting them cut and pinned in place out of 1⁄4” x 1⁄4” balsa stringers. The length …

Building Aero 3D Day 12: Elevator Framework Pinned Read More »