Building Seamaster Day 14: Float Sides & Fuse Side Joints

On April 7th I worked on the floats… sanding of them already took place and so I verified and then glued the sides to the support pieces.  You can see the system rigged up below to keep pieces in place along with clamps on the glue joints while the glue dried.   The other thing …

Building Seamaster Day 14: Float Sides & Fuse Side Joints Read More »